During the development of Lean Production the optimisation and minimisation of setup times became an important tool to recognise flowing processes with high variance.
In today´s industrialised life the goal of „zero setup time” is an important component in achieving a continuous improvement process. Short setup times are preconditions for frequent product changes and enable a flexible organisation with a production oriented to the customers` requirements. This eliminates many types of waste, such as overproduction and inventory. The setup time optimisation is the main factor in one-piece-flow-, just-in-time- and just-in-sequence-production.
General Managers, plant managers, managers and specialists from production, production-related areas.
Optimisation of setup-time: 8 steps to setup time „zero“:
These 8 steps will allow you to reduce the setup time from hours to minutes and seconds.
Online lecture, practical exercises/simulation and case studies, group work, discussion and exchange of experiences
At the end you will receive a certificate of successful participation in the training “SMED – Setup time optimisation”.
Bettina Dirks
Koordination Consulting
Tel. +49(0)89 42 01 74 71
Diese E-Mail-Adresse ist vor Spambots geschützt! Zur Anzeige muss JavaScript eingeschaltet sein!
REFA International AG
Elsenheimerstraße 61
D - 80687 München
Tel.: +49(0)89 42 01 74 71
Mail: info@refa-international.com